Hwy 53 Construction Update
Work of June 14 – 19
Memorial to 20th Street (Stage 2)
21st Street South, Granular embankment Begin 21st Street South Aggregate surfacing
15th Street to Industrial Ave. (Stage 3C) Continue Storm Sewer installation
Granular embankment
Work of June 21 26 Memorial to 20th Street (Stage 2)
Aggregate surfacing
Curb and gutter installation
Begin bituminous trail
Begin ADA concrete walks 15th Street to Industrial Ave. (Stage 3C)
Aggregate surfacing
Curb and gutter instaklation
Begin bituminous trail
Begin ADA concrete walks